LA Metro Crenshaw-LAX Transit Corridor, Los Angeles, CA
Agency: Los Angeles County Metropolitan Transportation Authority (METRO)
Morgner’s Role: Noise and Vibration Control Plan and Monitoring and Pre-Construction Photo Documentation Services
Project Description:
The Metro Crenshaw/LAX Transit Corridor Project will extend from the existing Metro Exposition Line at Crenshaw Blvd and Exposition Blvd. The Line will travel 8.5 miles to the Metro Green Line’s Aviation/LAX Station and will serve the cities of Los Angeles, Inglewood, Hawthorne and El Segundo; and portions of unincorporated Los Angeles County.
Morgner was contracted to perform pre-construction photo documentation of all at-risk properties along the alignment, as well as noise and vibration monitoring to reduce the risk of claims related to nuisance and/or damages. The project involves the coordination of the Project Manager, the Noise and Vibration Monitoring and the Operations Department to assign personnel, to resource the project with sound level meter equipment, to the demobilization of noise and vibration units, and to the submission of noise and vibration reports to the client in a timely manner.